Chirkeiskaya HPP

Sangtudinskaya HPP-1

 

The construction of Sangtudinskaya Hydro-1 was started (or rather resumed) in November 2005.

It was the construction of Sangtudinskaya HPP-1 where OJSC "ChirkeiGESstroy" in connection with its Petersburg contractor LLC "Geoizol" first in the CIS used the method called "Jet Grouting" arranging an impervious element in the dam core bed area base.

High skills of ChirkeiGESstroy specialists allowed the Company to complete the works on the intake channel, the dam and the powerhouse which is to be home for four units. As far as facilities in the specialists' terms were concerned they secured conditions for an early start of the first unit of Sangtudinskaya Hydro-1. 


 


 

Фото
Intake channel of Sangtudinskaya HPP-1
Installed capacity 670 MW
Average long-term power production 2.733 kW/hr
Number of units 4
Rock-and-earth dam  
height 76 m
crest length 540м
Power conduit of tunnel type 4
Normal impounded water level 571,5 m
Dead storage level 569,9 m

 