OAO «RUSGIDRO» Chirkeiskaya HPP
Chirkeyskaya HPP
The Chirkei hydroelektrik power station is located in a seismically active region in
a complicated geological environment. The project was first ever to be built
with a biconvex concrete arch dam: height -- 232.5m; crest thickness – 6m; at
the base – 30m. Concrete placement and assembly
operations were performed with the help of three cable cranes with a hoisting power of 25 tons and a span of
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|